SeaDoo Spark Forum banner
1 - 14 of 14 Posts

·
Registered
Joined
·
15 Posts
not sure about the labor cost but I have stripped one of our spark 60hp base models all the way down to nothing so that we had every piece out of it. If you have all the tools available it took me about 4 hours the first time with a helper. Could do it faster now I think. But that is to strip it down. To build it back up including all the caulking etc I would think at least a full day to get it all lined up and ready to go. Everything on this ski comes off with about 4 different sockets. Very simple to do.
 

Attachments

·
Registered
Joined
·
247 Posts
Seems like it would be easier than the 2 strokes because once you got the top off everything is right there and your BACK is thanking you! Thanks for posting the pictures!
 

·
Registered
Joined
·
25 Posts
Iv cracked mine and plastic welded it. Still holding too. I'll upload pic


Sent from my iPad
 

·
Registered
Joined
·
25 Posts



Sent from my iPhone using Tapatalk
 
1 - 14 of 14 Posts
Top